Telescopic Dog Lead 8.2 Feet Long Lead for Dog Training, Tangle Telescopic Anti Bite Lead with NonSlip Handle Red

$26.95
FREE Shipping

Telescopic Dog Lead 8.2 Feet Long Lead for Dog Training, Tangle Telescopic Anti Bite Lead with NonSlip Handle Red

  • Brand: Unbranded

Telescopic Dog Lead 8.2 Feet Long Lead for Dog Training, Tangle Telescopic Anti Bite Lead with NonSlip Handle Red

  • Brand: Unbranded
RRP: $39.95
Price: $26.95
You save: $13.00 (32%)
Sold by:
$26.95
FREE Shipping

Taxes calculated at checkout

In stock

We accept the following payment methods

Description

1. EFFORTLESS WALKING – Experience easy control and management with our retractable button design for dog leash. Simply adjust the length of the rope and slide it back and forth to lock or release your puppy. 2. NYLON ROPE – Our retractable dog leash is made of quality reinforced nylon rope, carefully selected for durability and robustness. 3. BETTER CONTROL – The nonslip palm and ergonomic design of our retractable leash provide better control over your furry friend. The comfortable handle ensures safe and enjoyable walks, for longterm use. 4. SAFE FAST BUCKLE – The quality coated metal buckle makes our retractable dog leash not only sturdy and durable but also resistant to wear and tear.
  • Fruugo ID: 393228831-840818350
  • EAN: 946692129752

Delivery & Returns

Dispatched within 24 hours

  • STANDARD: FREE - Delivery between Thu 06 November 2025–Mon 24 November 2025 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Shenzhen Tumi Technology Co., Ltd.
  • Shenzhen Tumi Technology Co., Ltd.
  • 202-03, Jinhe Building, 8 Xinhe Street, Maan Tang, Bantian
  • Longgang, Shenzhen, Guangdong
  • China
  • Shenzhen
  • CN
  • 518129
  • pettynfnef@outlook.com
  • 13332965772

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • Axitera GmbH
  • Axitera GmbH
  • Kreuznacher Str. 30
  • D-60486 Frankfurt am Main, Hessen
  • Germany
  • Frankfurt am Main
  • DE
  • 60486
  • successservice3@gmail.com
  • (+49) 6934873848
  • https://seller.kuajingmaihuo.com/settle/qualification-service