Long Lead for Dogs with LED Lighting, Strain Relief Design, Anti-Traction System - Suitable for Small Medium Breeds, Red

$35.95
FREE Shipping

Long Lead for Dogs with LED Lighting, Strain Relief Design, Anti-Traction System - Suitable for Small Medium Breeds, Red

  • Brand: Unbranded

Long Lead for Dogs with LED Lighting, Strain Relief Design, Anti-Traction System - Suitable for Small Medium Breeds, Red

  • Brand: Unbranded
RRP: $54.00
Price: $35.95
You save: $18.05 (33%)
Sold by:
$35.95
FREE Shipping

Taxes calculated at checkout

In stock

We accept the following payment methods

Description

Long Lead for Dogs with LED Lighting, Strain Relief Design, Anti-Traction System - Suitable for Small Medium Breeds, Red

- Synchronized Control for Two Dogs: Effortlessly manage walks with our innovative 2-in-1 retractable leash system, designed specifically for two dogs. This feature saves you time and energy while ensuring your pets stay coordinated and safe during outings. - Smooth Pull System: The 360-degree rotating design allows for gentle pulling, preventing tangles and enabling fluid movement for your dogs. Enjoy hassle-free walks as this leash enhances your pets' participation in daily activities. - Safe Running Experience: Experience precise control with the intuitive touch safety lock and double-acting buttons. The retractable leads easily adapt to various activities, from hiking to city strolls, providing peace of mind and unmatched versatility for you and your dogs. - Safe Walks in Low Light: Prioritize safety during evening walks with high-brightness LEDs that illuminate your path. These lights enhance visibility and guidance in low-light conditions, ensuring both you and your dogs have a practical and secure walking experience. - Perfect for Various Activities: Ideal for daily walks, outdoor adventures, and nighttime strolls, this retractable leash meets the demands of any pet owner. Its durable construction and user-friendly features make it a reliable choice for all your walking needs. - Compatibility and Performance: Designed for dogs of various sizes, this leash combines functionality with a comfortable grip, ensuring optimal performance during every walk. The robust materials used guarantee longevity, making it a smart investment for dog owners.
  • Fruugo ID: 384804936-827641604
  • EAN: 599682661697

Delivery & Returns

Dispatched within 24 hours

  • STANDARD: FREE - Delivery between Fri 19 December 2025–Tue 06 January 2026 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • FabFlick
  • Shenzhen Kulomi Technology Co., Ltd.
  • 401-13, Jinhe Building, 8 Xinhe Street, Maan Tang, Bantian
  • Longgang, Shenzhen, Guangdong
  • China
  • Shenzhen
  • CN
  • 518129
  • utopiadealsta@outlook.com
  • 13380310353

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • Synertrade FR SAS
  • Synertrade FR SAS
  • 9 rue du Bat d'Argent
  • Lyon
  • France
  • Lyon
  • FR
  • 69001
  • info@syner-sarl.cn
  • (+33)774555006
  • https://seller.kuajingmaihuo.com/settle/qualification-service