Long Lead for Dogs with LED Lighting, Strain Relief Design, Anti-Traction System - Suitable for Small Medium Breeds, Red
FREE Shipping
Long Lead for Dogs with LED Lighting, Strain Relief Design, Anti-Traction System - Suitable for Small Medium Breeds, Red
- Brand: Unbranded
Long Lead for Dogs with LED Lighting, Strain Relief Design, Anti-Traction System - Suitable for Small Medium Breeds, Red
- Brand: Unbranded
| RRP: | |
| Price: | |
| You save: | $19.05 (35%) |
Taxes calculated at checkout
In stock
We accept the following payment methods
Description
- Brand: Unbranded
- Category: Pet Leashes
- Fruugo ID: 384804936-827641604
- EAN: 599682661697
Delivery & Returns
Dispatched within 24 hours
-
STANDARD: FREE - Delivery between Fri 14 November 2025–Tue 02 December 2025 - FREE
Shipping from China.
We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy
Product Compliance Details
Please see the compliance information specific to this product outlined below.
The following information is provided by the independent third-party retailer selling this product.
Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.
- FabFlick
- Shenzhen Kulomi Technology Co., Ltd.
- 401-13, Jinhe Building, 8 Xinhe Street, Maan Tang, Bantian
- Longgang, Shenzhen, Guangdong
- China
- Shenzhen
- CN
- 518129
- utopiadealsta@outlook.com
- 13380310353
Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.
- Synertrade FR SAS
- Synertrade FR SAS
- 9 rue du Bat d'Argent
- Lyon
- France
- Lyon
- FR
- 69001
- info@syner-sarl.cn
- (+33)774555006
- https://seller.kuajingmaihuo.com/settle/qualification-service