K-Type Thermocouple Probe With Inner Core Protection Long Lead Wire High Temperature Resistant For Industrial Lab Use

$23.95
FREE Shipping

K-Type Thermocouple Probe With Inner Core Protection Long Lead Wire High Temperature Resistant For Industrial Lab Use

  • Brand: Unbranded

K-Type Thermocouple Probe With Inner Core Protection Long Lead Wire High Temperature Resistant For Industrial Lab Use

  • Brand: Unbranded
RRP: $35.95
Price: $23.95
You save: $12.00 (33%)
Sold by:
$23.95
FREE Shipping

Taxes calculated at checkout

In stock

14-Day Returns Policy

We accept the following payment methods

Description

K-Type Thermocouple Probe With Inner Core Protection Long Lead Wire High Temperature Resistant For Industrial Lab Use

High temperature resistance and durable design - Stable operation in high temperature environments with a robust K-type thermoelement core and a K-type air probe - Built to endure demanding industrial conditions and provide reliable sensing over time High precision temperature measurement - Uses a K-type thermocouple junction for accurate temperature readings - Includes a 3 meter instrument thermocouple lead and a standard thermometer connection for easy integration Precision sensing for exhaust and process monitoring - Equipped with a K-type surface junction for high-precision detection - Features a thermoelement sensor and an exhaust gas probe for reliable exhaust measurements Flexible, ready-to-integrate monitoring - 3 meter temperature lead offers convenient mounting and wiring options - Compatible with common temperature monitoring devices and facilities Typical applications - Industrial furnaces, kilns, and high-temperature processing where stable, accurate readings are essential - Automotive or stationary engine exhaust testing and exhaust gas temperature monitoring - Laboratory material testing, process control, and quality assurance environments
  • Fruugo ID: 392216872-839203853
  • EAN: 198579167269

Delivery & Returns

Dispatched within 24 hours

  • STANDARD: FREE - Delivery between Wed 24 December 2025–Fri 09 January 2026 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • GlowGrove
  • Shenzhen Tumi Technology Co., Ltd.
  • 202-03, Jinhe Building, 8 Xinhe Street, Maan Tang, Bantian
  • Longgang, Shenzhen, Guangdong
  • China
  • Shenzhen
  • CN
  • 518129
  • pettynfnef@outlook.com
  • 13332965772

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • Synertrade FR SAS
  • Synertrade FR SAS
  • 9 rue du Bat d'Argent
  • Lyon
  • France
  • Lyon
  • FR
  • 69001
  • info@syner-sarl.cn
  • (+33)774555006
  • https://seller.kuajingmaihuo.com/settle/qualification-service