Horse Training Rope 2.0 m Lead Rope With Snap Closure Sapphire Strong Cord Groundwork And Long Lead For Equestrian

$23.95
FREE Shipping

Horse Training Rope 2.0 m Lead Rope With Snap Closure Sapphire Strong Cord Groundwork And Long Lead For Equestrian

  • Brand: Unbranded

Horse Training Rope 2.0 m Lead Rope With Snap Closure Sapphire Strong Cord Groundwork And Long Lead For Equestrian

  • Brand: Unbranded
RRP: $35.95
Price: $23.95
You save: $12.00 (33%)
Sold by:
$23.95
FREE Shipping

Taxes calculated at checkout

In stock

We accept the following payment methods

Description

Superior material and robust design - Thick solid construction and high quality material protect the horse from rope burns or irritation - Full length of 2 meters enables safe handling with improved control and comfort Easy to use and safe - Fasteners are designed for easy maneuverability with minimal force to enhance safety and reliability - Rust resistant reinforced zinc alloy components prevent rusting and extend durability Comfortable grip for all levels - Provides a stable, comfortable grip that helps improve control during daily handling and riding activities Low maintenance and durable - Designed to stay functional and attractive over prolonged use - Built for trouble-free maintenance and long-lasting performance Specifications and features - Length: 2 meters - Material: high quality lead rope material - Fasteners: user-friendly for easy maneuverability - Hardware: rust resistant reinforced zinc alloy to prevent rust and enhance durability - Suitability: appropriate for riders and handlers at all levels Use scenarios - Leading in the stable, paddock, or during turnout and grooming to maintain control with comfort - Ground work and handling during tack up, grooming, or routine training sessions - Safe trailer loading and unloading, or moving between locations with steady handling Why you need this lead rope - Reduces risk of rope burns and horse irritation with a thick, solid design - Improves handling safety and control through a longer 2 meter length - Delivers reliable performance with rust resistant hardware and durable construction - Maintains a neat appearance and remains easy to maintain after regular use
  • Fruugo ID: 387257961-831447739
  • EAN: 460556784678

Delivery & Returns

Dispatched within 24 hours

  • STANDARD: FREE - Delivery between Fri 24 October 2025–Tue 11 November 2025 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Shenzhen Kulomi Technology Co., Ltd.
  • Shenzhen Kulomi Technology Co., Ltd.
  • 401-13, Jinhe Building, 8 Xinhe Street, Maan Tang, Bantian
  • Longgang, Shenzhen, Guangdong
  • China
  • Shenzhen
  • CN
  • 518129
  • utopiadealsta@outlook.com
  • 13380310353

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • Axitera GmbH
  • Axitera GmbH
  • Kreuznacher Str. 30
  • D-60486 Frankfurt am Main, Hessen
  • Germany
  • Frankfurt am Main
  • DE
  • 60486
  • successservice3@gmail.com
  • (+49) 6934873848
  • https://seller.kuajingmaihuo.com/settle/qualification-service