Dog Tie Out Stake and Run Cable, 30FT Long Lead with Yard Stake, Cha for Outside, Leash Camping Beach, Tether Medium Large Dogs, Ice Blue

$64.00
FREE Shipping

Dog Tie Out Stake and Run Cable, 30FT Long Lead with Yard Stake, Cha for Outside, Leash Camping Beach, Tether Medium Large Dogs, Ice Blue

  • Brand: Unbranded

Dog Tie Out Stake and Run Cable, 30FT Long Lead with Yard Stake, Cha for Outside, Leash Camping Beach, Tether Medium Large Dogs, Ice Blue

  • Brand: Unbranded
RRP: $94.00
Price: $64.00
You save: $30.00 (31%)
Sold by:
$64.00
FREE Shipping

Taxes calculated at checkout

In stock

We accept the following payment methods

Description

1. Tie Out Stake: Our dog tie out cable and stake set is designed to be more solid and durable. The thickened stainless steel spiral stake and reinforced Oring make this dog anchor less likely to break or bend. The ergonomic handle of the dog ground stake provides more comfort when inserting and pulling out, saving time and effort. 2. 30FT Chain Dog Leash: Our 30 feet dog tie out leads for yard feature a 5.0mm diameter stainless steel vinylcoated rope that has been strength tested for dogs up to 150lbs. All the run cables have been rigorously quality tested to withstand a pull force of up to 5000N, providing more space for movement while ensuring . 3. Buckle: The heavy duty 360° swivel clip is made of high grade steel, which is rustproof and wearresistant. It is ultralight but super strong for small to large dogs. Both ends of the dog chain leads have tangle clips, which can reduce tangling when the dog is moving, aiming to prevent dogs from being entangled. 4. : With the ergonomic handle and spiral stake design, you can easily screw the dog yard stake into the ground and then connect it to the tie out cable. The quick release clips ensure easy on off connection, saving time and effort.
  • Fruugo ID: 359919371-782727626
  • EAN: 439757241488

Delivery & Returns

Dispatched within 24 hours

  • STANDARD: FREE - Delivery between Wed 15 October 2025–Fri 31 October 2025 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Shenzhen Kulomi Technology Co., Ltd.
  • Shenzhen Kulomi Technology Co., Ltd.
  • 401-13, Jinhe Building, 8 Xinhe Street, Maan Tang, Bantian
  • Longgang, Shenzhen, Guangdong
  • China
  • Shenzhen
  • CN
  • 518129
  • utopiadealsta@outlook.com
  • 13380310353

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • Axitera GmbH
  • Axitera GmbH
  • Kreuznacher Str. 30
  • D-60486 Frankfurt am Main, Hessen
  • Germany
  • Frankfurt am Main
  • DE
  • 60486
  • successservice3@gmail.com
  • (+49) 6934873848
  • https://seller.kuajingmaihuo.com/settle/qualification-service