10mm DC 5V 2-Phase 4-Wire Linear Screw Stepper Motor with Long Lead Linear Shaft Rod for Precise Motion Control
FREE Shipping
10mm DC 5V 2-Phase 4-Wire Linear Screw Stepper Motor with Long Lead Linear Shaft Rod for Precise Motion Control
- Brand: Unbranded
10mm DC 5V 2-Phase 4-Wire Linear Screw Stepper Motor with Long Lead Linear Shaft Rod for Precise Motion Control
- Brand: Unbranded
| RRP: | |
| Price: | |
| You save: | $15.00 (31%) |
Taxes calculated at checkout
In stock
14-Day Returns Policy
Payment methods:
Description
10mm DC 5V 2-Phase 4-Wire Linear Screw Stepper Motor with Long Lead Linear Shaft Rod for Precise Motion Control
- Brand: Unbranded
- Category: Specialty Electrical Switches & Relays
- Fruugo ID: 368140907-797079733
- EAN: 929285261381
Delivery & Returns
Dispatched within 24 hours
-
STANDARD: FREE - Delivery between Fri 16 January 2026–Tue 03 February 2026 - FREE
Shipping from China.
We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy
Product Compliance Details
Please see the compliance information specific to this product outlined below.
The following information is provided by the independent third-party retailer selling this product.
Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.
- HappyHaven
- Shenzhen Tuku Supply Chain Co., Ltd.
- 202-5, Jinhe Building, 8 Xinhe Street
- Maan Tang, Bantian , Longgang, Shenzhen, Guangdong
- China
- Guangdong
- CN
- 518129
- caryleroot@outlook.com
- 13428666765
Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.
- Synertrade FR SAS
- Synertrade FR SAS
- 9 rue du Bat d'Argent
- Lyon
- France
- Lyon
- FR
- 69001
- info@syner-sarl.cn
- (+33)774555006
- https://seller.kuajingmaihuo.com/settle/qualification-service